Caution on banks and in forest
Interview of Professor Lyesse Laloui at the RTS on the risks during the period of flood reduction
During the period of flood reduction, the level of water reduces more quickly than the pore water pressures in the ground of banks, which makes the risk of instibiliy the highest.